Solar · United Kingdom

Whitehead Landfill Site, Lower Green Lane - Solar Farm

Operator Whitehead Restoration Limited · Owner Green Earth Developments (Group) Limited

Revised10 MWData checked 16 November 2026Source record dated 27 September 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Whitehead Landfill Site, Lower Green Lane - Solar Farm is a 10 MW solar farm 3.2 km south of Tyldesley, Greater Manchester, United Kingdom. Its planning application (A/24/97074/MAJOR) went to Wigan on 3 April 2024. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 91 other energy sites within 10 km, 48 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

WHITEHEAD RESTORATION LTD (08936769), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Whitehead Landfill Site, Lower Green Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 4.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school4.5 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent50 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall55 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Whitehead Restoration Limited
Owner
Green Earth Developments (Group) Limited
Location
Whitehead Landfill Site, Lower Green Lane, Astley, Manchester, Greater Manchester, M29 7JZ, United Kingdom
Planning authority
Wigan
Planning application
A/24/97074/MAJOR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for A/24/97074/MAJOR, with what the planning evidence pack adds for this site.

Every application in Wigan · Alerts for applications and incidents near here

  • 3 April 2024 Planning application submitted

None found. The register holds no published incident that names Whitehead Landfill Site, Lower Green Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Whitehead Landfill Site, Lower Green Lane - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Whitehead Landfill Site, Lower Green Lane - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Whitehead Landfill Site, Lower Green Lane - Solar Farm?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 27 September 2024.
Where is Whitehead Landfill Site, Lower Green Lane - Solar Farm?
3.2 km south of Tyldesley, Greater Manchester, United Kingdom (postcode M29 7JZ).