Battery storage · United Kingdom

Carrick Windfarm

Operator ScottishPower Renewables · Owner Scottishpower Renewable Energy Limited

Application Refused20 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Carrick Windfarm is a 20 MW battery storage site 19 km east of Girvan, Ayrshire, United Kingdom. Its planning application (ECU00003392) went to Scottish Government (S36) on 6 December 2021 and was refused on 5 November 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 8 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 22 other sites and 210 energy sites within 40 km for Carrick Windfarm

Members see the sites and incidents around this one, and every record behind them.

SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
ScottishPower Renewables
Owner
Scottishpower Renewable Energy Limited
Location
Land within Carrick Forest, Kilmarnock, Ayrshire, KA19, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00003392

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00003392, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 6 December 2021 Planning application submitted
  • 5 November 2025 Planning permission refused

None found. The register holds no published incident that names Carrick Windfarm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Carrick Windfarm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Carrick Windfarm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Carrick Windfarm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Carrick Windfarm?
19 km east of Girvan, Ayrshire, United Kingdom (postcode KA19).