← Back to Ayrshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Knockcronal Wind Farm

Operator Statkraft UK Limited · Owner Ministry Of Trade, Industry And Fisheries

Awaiting ConstructionData checked 16 November 2026Source record dated 8 January 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Knockcronal Wind Farm is a battery storage site 20 km east of Girvan, Ayrshire, United Kingdom. Its planning application (ECU00002181) went to Scottish Government (S36) on 17 November 2021 and was granted on 5 November 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 18 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

STATKRAFT UK LTD (05742795), active, since 2006. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Knockcronal Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 235 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool235 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells328 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire432 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Statkraft UK Limited
Owner
Ministry Of Trade, Industry And Fisheries
Location
4.8 km south of Straiton and 17.4 km east of Girvan, Maybole, Ayrshire, KA19 7NF, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00002181

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00002181, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 17 November 2021 Planning application submitted
  • 5 November 2025 Planning permission granted
  • 5 November 2030 Planning permission runs out

None found. The register holds no published incident that names Knockcronal Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Knockcronal Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Knockcronal Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Knockcronal Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 January 2026.
Where is Knockcronal Wind Farm?
20 km east of Girvan, Ayrshire, United Kingdom (postcode KA19 7NF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).