Operator Enray Power · Owner Camblesforth Solar Farm Limited
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 23 October 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Camblesforth Solar Farm is a 49.9 MW solar farm 6.1 km south-east of Selby, North Yorkshire, United Kingdom. Its planning application (2021/0788/EIA) went to North Yorkshire on 30 June 2021 and was granted on 8 July 2022. It has been operating since 1 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 55 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Camblesforth Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
ENRAY POWER LTD (13052159), active, since 2020. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Camblesforth Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 28 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 28 km | Significant |
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 47 km | Minor |
| EIR-1175 | 2026 | Rooftop solar panel fire guts NHS mental health ward in Malton | 47 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Enray Power
- Owner
- Camblesforth Solar Farm Limited
- Location
- Land Off, Camela Lane, Camblesforth, Selby, North Yorkshire, North Yorkshire, YO8 8HA, United Kingdom
- Planning authority
- North Yorkshire
- Planning application
- 2021/0788/EIA
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2021/0788/EIA, with what the planning evidence pack adds for this site.
Every application in North Yorkshire · Alerts for applications and incidents near here
Timeline
- 30 June 2021 Planning application submitted
- 8 July 2022 Planning permission granted
- 1 February 2025 Construction started
- 1 July 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Camblesforth Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Camblesforth Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Camblesforth Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Camblesforth Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 October 2026.
- Where is Camblesforth Solar Farm?
- 6.1 km south-east of Selby, North Yorkshire, United Kingdom (postcode YO8 8HA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).