← Back to Derbyshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Hallgate Farm - Battery Energy Storage

Operator Enray Power

Awaiting ConstructionData checked 16 November 2026Source record dated 22 January 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Hallgate Farm - Battery Energy Storage is a battery storage site 6.2 km south-east of Wingerworth, Derbyshire, United Kingdom. Its planning application (25/00703/MFL) went to North East Derbyshire on 26 August 2025 and was granted on 11 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 63 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENRAY POWER LTD (13052159), active, since 2020. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hallgate Farm - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells18 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool106 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire165 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Enray Power
Location
Hallgate Farm, Hallgate Lane, Pilsley, Chesterfield, Derbyshire, S45 8HN, United Kingdom
Planning authority
North East Derbyshire
Planning application
25/00703/MFL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00703/MFL, with what the planning evidence pack adds for this site.

Every application in North East Derbyshire · Alerts for applications and incidents near here

  • 26 August 2025 Planning application submitted
  • 11 December 2025 Planning permission granted
  • 11 December 2028 Planning permission runs out

None found. The register holds no published incident that names Hallgate Farm - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Hallgate Farm - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hallgate Farm - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hallgate Farm - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 January 2026.
Where is Hallgate Farm - Battery Energy Storage?
6.2 km south-east of Wingerworth, Derbyshire, United Kingdom (postcode S45 8HN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).