← Back to Derbyshire

Solar · United Kingdom

Padleywood Farm

Operator OST Energy

Operational5 MWData checked 16 November 2026Source record dated 31 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Padleywood Farm is a 5 MW solar farm 5.6 km north of Alfreton, Derbyshire, United Kingdom. Its planning application (15/00224/FL) went to North East Derbyshire on 5 March 2015 and was granted on 19 August 2015. It has been operating since 29 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, 37 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 567 energy sites within 40 km for Padleywood Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
OST Energy
Location
Padleywood Farm, Evershill Lane, Morton, Alfreton, Derbyshire, Derbyshire, DE55 6HB, United Kingdom
Planning authority
North East Derbyshire
Planning application
15/00224/FL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00224/FL, with what the planning evidence pack adds for this site.

Every application in North East Derbyshire · Alerts for applications and incidents near here

  • 5 March 2015 Planning application submitted
  • 19 August 2015 Planning permission granted
  • 1 December 2015 Construction started
  • 29 March 2016 Operational

None found. The register holds no published incident that names Padleywood Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Padleywood Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Padleywood Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Padleywood Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 August 2016.
Where is Padleywood Farm?
5.6 km north of Alfreton, Derbyshire, United Kingdom (postcode DE55 6HB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).