Planning pack for this site, £295Other options

Battery storage · United Kingdom

Camblesforth Solar Farm

Operator Enray Power

Awaiting Construction10 MWData checked 16 November 2026Source record dated 23 October 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Camblesforth Solar Farm is a 10 MW battery storage site 6.1 km south-east of Selby, North Yorkshire, United Kingdom. Its planning application (2021/0788/EIA) went to North Yorkshire on 30 June 2021 and was granted on 8 July 2022. It has been operating since 1 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 55 other energy sites within 10 km, 29 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENRAY POWER LTD (13052159), active, since 2020. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Camblesforth Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 69 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells69 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool131 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire233 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Enray Power
Location
Land Off, Camela Lane, Camblesforth, Selby, North Yorkshire, North Yorkshire, YO8 8HA, United Kingdom
Planning authority
North Yorkshire
Planning application
2021/0788/EIA
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2021/0788/EIA, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 30 June 2021 Planning application submitted
  • 8 July 2022 Planning permission granted
  • 1 February 2025 Construction started
  • 1 July 2026 Operational

None found. The register holds no published incident that names Camblesforth Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Camblesforth Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Camblesforth Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Camblesforth Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 October 2026.
Where is Camblesforth Solar Farm?
6.1 km south-east of Selby, North Yorkshire, United Kingdom (postcode YO8 8HA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).