← Back to Grampian

Solar · United Kingdom

Cairnhill Farm solar park

Operator Green Cat Renewables · Owner Green Cat Holdco Limited

Operational2.4 MWData checked 16 November 2026Source record dated 16 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cairnhill Farm solar park is a 2.4 MW solar farm 5.7 km north-east of Turriff, Grampian, United Kingdom. Its planning application (APP/2013/0997) went to Aberdeenshire on 2 April 2013 and was granted on 31 May 2013. It has been operating since 15 September 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 34 other sites and 251 energy sites within 40 km for Cairnhill Farm solar park

Members see the sites and incidents around this one, and every record behind them.

GREEN CAT RENEWABLES LIMITED (SC277156), active, since 2004. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
2.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Green Cat Renewables
Owner
Green Cat Holdco Limited
Location
Cairnhill, Turriff, Grampian, Grampian, AB53 5TN, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2013/0997
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2013/0997, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 2 April 2013 Planning application submitted
  • 31 May 2013 Planning permission granted
  • 15 April 2015 Construction started
  • 15 September 2015 Operational

None found. The register holds no published incident that names Cairnhill Farm solar park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cairnhill Farm solar park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cairnhill Farm solar park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cairnhill Farm solar park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2016.
Where is Cairnhill Farm solar park?
5.7 km north-east of Turriff, Grampian, United Kingdom (postcode AB53 5TN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).