← Back to Grampian

Onshore wind · United Kingdom

Burnside of Idoch

Operator Scottish and Southern Energy (SSE)

Appeal Refused3.2 MWData checked 16 November 2026Source record dated 28 November 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Burnside of Idoch is a 3.2 MW wind farm 4.7 km east of Turriff, Grampian, United Kingdom. Its planning application (APP/2010/0405) went to Aberdeenshire on 12 February 2010 and was refused on appeal on 14 February 2011. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 20 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 48 other sites and 262 energy sites within 40 km for Burnside of Idoch

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
3.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Scottish and Southern Energy (SSE)
Location
Turriff, Aberdeenshire, Grampian, AB53 8DY, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2010/0405
Appeal reference
PPA-110-2070
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2010/0405, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 12 February 2010 Planning application submitted
  • 12 November 2010 Planning permission refused
  • 14 February 2011 Appeal refused

None found. The register holds no published incident that names Burnside of Idoch. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Burnside of Idoch had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Burnside of Idoch; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Burnside of Idoch?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 28 November 2011.
Where is Burnside of Idoch?
4.7 km east of Turriff, Grampian, United Kingdom (postcode AB53 8DY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).