Solar · United Kingdom
Britannia Crest
Operator Green Switch Solutions
Appeal Refused2.6 MWData checked 16 November 2026Source record dated 4 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Britannia Crest is a 2.6 MW solar farm 3.1 km north-west of Horley, Surrey, United Kingdom. Its planning application (15/01424/F) went to Reigate and Banstead on 24 June 2015 and was refused on appeal on 14 April 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 37 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Britannia Crest changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 2.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- Green Switch Solutions
- Location
- Land Adj To Britanniacrest, 26 Reigate Road, Hookwood, Horley, Surrey, RH6 0HJ, United Kingdom
- Planning authority
- Reigate and Banstead
- Planning application
- 15/01424/F
- Appeal reference
- APP/L3625/W/16/3142233
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/01424/F, with what the planning evidence pack adds for this site.
Every application in Reigate and Banstead · Alerts for applications and incidents near here
Timeline
- 24 June 2015 Planning application submitted
- 27 November 2015 Planning permission refused
- 20 January 2016 Appeal lodged
- 14 April 2016 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Britannia Crest. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Britannia Crest had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Britannia Crest; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Britannia Crest?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 May 2016.
- Where is Britannia Crest?
- 3.1 km north-west of Horley, Surrey, United Kingdom (postcode RH6 0HJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).