Solar · United Kingdom
Bramley Frith Solar Farm
Operator Bramley Solar Limited
Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 30 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bramley Frith Solar Farm is a 49.9 MW solar farm 4.3 km east of Tadley, Berkshire, United Kingdom. Its planning application (20/03403/FUL) went to Basingstoke and Deane on 4 December 2020 and was granted on appeal on 13 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 50 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bramley Frith Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bramley Frith Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 7.7 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1273 | 2022 | Solar panels believed to have started roof fire at house in Old Basing | 7.7 km | Minor |
| EIR-1531 | 2022 | Fire involving solar panels damages roof of flats in Fleet | 18 km | Significant |
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 37 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Bramley Solar Limited
- Location
- Minchens Lane, Berkshire, RG7 2LN, United Kingdom
- Planning authority
- Basingstoke and Deane
- Planning application
- 20/03403/FUL
- Appeal reference
- 22/00035/REF
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/03403/FUL, with what the planning evidence pack adds for this site.
Every application in Basingstoke and Deane · Alerts for applications and incidents near here
Timeline
- 4 December 2020 Planning application submitted
- 21 April 2022 Planning permission refused
- 4 August 2022 Appeal lodged
- 13 February 2023 Planning permission granted
- 13 February 2023 Appeal granted
- 13 February 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Bramley Frith Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bramley Frith Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bramley Frith Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bramley Frith Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2020.
- Where is Bramley Frith Solar Farm?
- 4.3 km east of Tadley, Berkshire, United Kingdom (postcode RG7 2LN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).