← Back to Berkshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Ash Lane, Little London - Battery Storage Facility

Operator AGR Group

Awaiting ConstructionData checked 16 November 2026Source record dated 6 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Ash Lane, Little London - Battery Storage Facility is a battery storage site 3.5 km east of Tadley, Berkshire, United Kingdom. Its planning application (24/00075/FUL) went to Basingstoke and Deane on 11 January 2024 and was granted on 18 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 51 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ash Lane, Little London - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 72 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire72 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction105 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter180 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AGR Group
Location
The E/O Ash Lane & Ash Park Business Centre, Ash Lane, Little London, Bramley, Reading, Berkshire, RG7 2LS, United Kingdom
Planning authority
Basingstoke and Deane
Planning application
24/00075/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00075/FUL, with what the planning evidence pack adds for this site.

Every application in Basingstoke and Deane · Alerts for applications and incidents near here

  • 18 April 2011 Planning permission expired
  • 11 January 2024 Planning application submitted
  • 18 April 2025 Planning permission granted

None found. The register holds no published incident that names Ash Lane, Little London - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Ash Lane, Little London - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ash Lane, Little London - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ash Lane, Little London - Battery Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2025.
Where is Ash Lane, Little London - Battery Storage Facility?
3.5 km east of Tadley, Berkshire, United Kingdom (postcode RG7 2LS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).