← Back to Berkshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Bramley FR (Bramley Frith Solar Farm)

Operator Bramley Solar Limited · Owner Enso Green Holdings Limited

Awaiting Construction57 MWData checked 16 November 2026Source record dated 7 February 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bramley FR (Bramley Frith Solar Farm) is a 57 MW battery storage site 4.3 km east of Tadley, Berkshire, United Kingdom. Its planning application (20/03403/FUL) went to Basingstoke and Deane on 4 December 2020 and was granted on appeal on 13 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 50 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENSO GREEN HOLDINGS LIMITED (12153574), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bramley FR (Bramley Frith Solar Farm) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 73 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire73 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction104 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter181 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
57 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Bramley Solar Limited
Owner
Enso Green Holdings Limited
Location
Minchens Lane, Berkshire, RG7 2LN, United Kingdom
Planning authority
Basingstoke and Deane
Planning application
20/03403/FUL
Appeal reference
22/00035/REF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/03403/FUL, with what the planning evidence pack adds for this site.

Every application in Basingstoke and Deane · Alerts for applications and incidents near here

  • 4 December 2020 Planning application submitted
  • 21 April 2022 Planning permission refused
  • 4 August 2022 Appeal lodged
  • 13 February 2023 Planning permission granted
  • 13 February 2023 Appeal granted
  • 13 February 2026 Planning permission expired

None found. The register holds no published incident that names Bramley FR (Bramley Frith Solar Farm). If you know of one, report it (confidential reports are anonymised).

Has Bramley FR (Bramley Frith Solar Farm) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bramley FR (Bramley Frith Solar Farm); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bramley FR (Bramley Frith Solar Farm)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 February 2021.
Where is Bramley FR (Bramley Frith Solar Farm)?
4.3 km east of Tadley, Berkshire, United Kingdom (postcode RG7 2LN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).