← Back to Hampshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage

Operator Ash Park Business Centre

Application Submitted0.2 MWData checked 16 November 2026Source record dated 5 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage is a 0.2 MW solar farm 3.2 km south-east of Tadley, Hampshire, United Kingdom. Its planning application (26/01199/FUL) went to Basingstoke and Deane on 14 July 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 48 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 72 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire72 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction106 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter180 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Ash Park Business Centre
Location
Ash Park Business Centre Ash Lane Little London, Hampshire, RG26 5FL, United Kingdom
Planning authority
Basingstoke and Deane
Planning application
26/01199/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/01199/FUL, with what the planning evidence pack adds for this site.

Every application in Basingstoke and Deane · Alerts for applications and incidents near here

  • 14 July 2026 Planning application submitted

None found. The register holds no published incident that names Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2026.
Where is Ash Park Business Centre, Ash Lane -Solar Panels & Battery Storage?
3.2 km south-east of Tadley, Hampshire, United Kingdom (postcode RG26 5FL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).