Solar · United Kingdom

Binsted Farm

Operator Lightsource BP

Operational5 MWData checked 16 November 2026Source record dated 31 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Binsted Farm is a 5 MW solar farm on the edge of Yapton, West Sussex, United Kingdom. Its planning application (WA/34/15/PL) went to Arun on 6 July 2015 and was granted on 28 September 2015. It has been operating since 31 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 29 other sites and 174 energy sites within 40 km for Binsted Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource BP
Location
Land East of Yapton Lane, Walberton, West Sussex, DN31 2SY, United Kingdom
Planning authority
Arun
Planning application
WA/34/15/PL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WA/34/15/PL, with what the planning evidence pack adds for this site.

Every application in Arun · Alerts for applications and incidents near here

  • 6 July 2015 Planning application submitted
  • 28 September 2015 Planning permission granted
  • 31 January 2016 Construction started
  • 31 March 2016 Operational

None found. The register holds no published incident that names Binsted Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Binsted Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Binsted Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Binsted Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 August 2016.
Where is Binsted Farm?
On the edge of Yapton, West Sussex, United Kingdom (postcode DN31 2SY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).