Solar · United Kingdom
Avisford Park Hotel, Yapton Lane - Solar Panels
Operator Novalux Solar
Operational0.2 MWData checked 16 November 2026Source record dated 13 August 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Avisford Park Hotel, Yapton Lane - Solar Panels is a 0.2 MW solar farm on the edge of Barnham, West Sussex, United Kingdom. Its planning application (WA/107/25/PL) went to Arun on 9 January 2026 and was granted on 24 March 2026. It has been operating since 20 July 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Avisford Park Hotel, Yapton Lane - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Novalux Solar
- Location
- Tennis court, Avisford Park Hotel Yapton Lane Walberton, West Sussex, BN18 0LS, United Kingdom
- Planning authority
- Arun
- Planning application
- WA/107/25/PL
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for WA/107/25/PL, with what the planning evidence pack adds for this site.
Every application in Arun · Alerts for applications and incidents near here
Status changed from Awaiting Construction to Operational on 16 November 2026.
Timeline
- 9 January 2026 Planning application submitted
- 24 March 2026 Planning permission granted
- 20 July 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Avisford Park Hotel, Yapton Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Avisford Park Hotel, Yapton Lane - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Avisford Park Hotel, Yapton Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Avisford Park Hotel, Yapton Lane - Solar Panels?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Avisford Park Hotel, Yapton Lane - Solar Panels?
- On the edge of Barnham, West Sussex, United Kingdom (postcode BN18 0LS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).