Onshore wind · United Kingdom
Achlachan 2 Windfarm
Operator The Energy Workshop
Revised7.5 MWData checked 16 November 2026Source record dated 4 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Achlachan 2 Windfarm is a 7.5 MW wind farm 17 km south of Thurso, Highland, United Kingdom. Its planning application (15/01831/FUL) went to Highland on 11 May 2015 and was refused on 18 September 2015. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 25 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Achlachan 2 Windfarm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
THE ENERGY WORKSHOP LIMITED (04546615), active, since 2002. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Achlachan 2 Windfarm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 188 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 188 km | Significant |
| EIR-0063 | 2024 | Fatal fall from turbine nacelle during onshore wind maintenance, UK | 188 km | Major |
| EIR-0032 | 2017 | Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment | 188 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 7.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- The Energy Workshop
- Location
- Achlachan 2 Windfarm, Watten, Wick, Highlands, Highland, KW1 5U, United Kingdom
- Planning authority
- Highland
- Planning application
- 15/01831/FUL
- Turbines
- 3, 110 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/01831/FUL, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 11 May 2015 Planning application submitted
- 18 September 2015 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Achlachan 2 Windfarm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Achlachan 2 Windfarm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Achlachan 2 Windfarm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Achlachan 2 Windfarm?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 4 May 2016.
- Where is Achlachan 2 Windfarm?
- 17 km south of Thurso, Highland, United Kingdom (postcode KW1 5U).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).