Battery storage · United Kingdom

Mybster Farm, Watten - Battery Storage

Operator Ella Energy Partnership

Application Withdrawn19.8 MWData checked 16 November 2026Source record dated 13 July 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Mybster Farm, Watten - Battery Storage is a 19.8 MW battery storage site 16 km south of Thurso, Highland, United Kingdom. Its planning application (26/01345/FUL) went to Highland on 26 April 2026 and was withdrawn on 9 June 2026. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 24 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

124 energy sites within 40 km for Mybster Farm, Watten - Battery Storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
19.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Ella Energy Partnership
Location
611m Nw/O Mybster Farm, Watten, Wick, Highland, KW1 5XW, United Kingdom
Planning authority
Highland
Planning application
26/01345/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/01345/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 26 April 2026 Planning application submitted
  • 9 June 2026 Application withdrawn

None found. The register holds no published incident that names Mybster Farm, Watten - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mybster Farm, Watten - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mybster Farm, Watten - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mybster Farm, Watten - Battery Storage?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2026.
Where is Mybster Farm, Watten - Battery Storage?
16 km south of Thurso, Highland, United Kingdom (postcode KW1 5XW).