← Back to Highland
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Spittal Mains Quarry - Battery storage

Operator Fig Power Limited · Owner Spittal Battery Storage Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Spittal Mains Quarry - Battery storage is a 49.9 MW battery storage site 15 km south of Thurso, Highland, United Kingdom. Its planning application (24/02827/FUL) went to Highland on 15 July 2024 and was granted on 28 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 7 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Spittal Mains Quarry - Battery storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 565 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool565 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells612 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire757 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Fig Power Limited
Owner
Spittal Battery Storage Limited
Location
Spittal Mains Quarry Spittal, Highland, KW1 5XR, United Kingdom
Planning authority
Highland
Planning application
24/02827/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/02827/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 15 July 2024 Planning application submitted
  • 28 March 2025 Planning permission granted

None found. The register holds no published incident that names Spittal Mains Quarry - Battery storage. If you know of one, report it (confidential reports are anonymised).

Has Spittal Mains Quarry - Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Spittal Mains Quarry - Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Spittal Mains Quarry - Battery storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Spittal Mains Quarry - Battery storage?
15 km south of Thurso, Highland, United Kingdom (postcode KW1 5XR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).