A fire broke out at a two-storey Vector electrical substation on McNab Street, Penrose, Auckland, on 5 November 2026. Fire and Emergency New Zealand was alerted at 3.24pm and sent 12 crews, three aerial appliances and three special appliances. Crews found the...
Southern
Named in a role in 1 record, and mentioned in the text of 32 entries, in 2017.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Southern? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Southern
Homes in Woodstock, Oxfordshire, lost power on the evening of 29 October 2026 after an electrical transformer caught fire on Hensington Road. Oxfordshire Fire and Rescue Service attended and extinguished the fire. Thames Valley Police's Woodstock...
Surrey Fire and Rescue Service was called at 4.30pm on 21 September 2026 to a fire at an electricity substation on Caterfield Road in Oxted. Two fire engines attended. Caterfield Lane was closed in both directions between Red Lane and Park Road. The service...
See what failed, why, and what it cost
The record behind each entry: the manufacturer, integrator and operator, root cause, failure mode, downtime, losses and every source.
Emergency services were called to reports of an explosion at a distribution substation in a residential area of Southampton, United Kingdom, on a Saturday evening. Fire crews attended and carried out thermal imaging checks but found no signs of smoke or fire....
A substation on Gloucester Close in the Queens Crescent area of Chippenham, Wiltshire, caught fire and exploded shortly after 6pm on 6 January 2026. At least one explosion was heard as the fire broke out, knocking out power to hundreds of homes in the town....
An electrical transformer in an underground vault exploded on a Thursday night, leaving parts of downtown Santa Barbara without power. Firefighters were dispatched at about 9:20 p.m. to the vault on Anacapa Street at Cota Street. No injuries were reported,...
A fire occurred in a reactor at a transmission substation in Southern Brazil, part of a grid network associated with Eletrobras, causing the facility to shut down and the region to disconnect from the wider system. The affected region had been exporting a...
In January 2025, widespread power outages affected more than four million customers of Southern California Edison across Los Angeles, Ventura, Orange, San Bernardino, Riverside and San Diego counties in California, as the Palisades and Eaton fires and high...
A transformer failure at a Southern California Edison substation in the Downey/Norwalk area of California caused a widespread power outage on 24 December 2024. Southern California Edison said the outage began around 1:30 p.m. and affected more than 31,000...
On 15 September 2023, homes and businesses near Clachnaharry, Raigmore and Inverness city centre were without power after a reported fire at an electrical substation. Scottish Fire and Rescue Service said crews were called at 3.30am to a building fire at...
A wind turbine caught fire at the Lerida Road windfarm near Goulburn, New South Wales, on the morning of Thursday 5 January 2023. Firefighters from the NSW Rural Fire Service, Goulburn Brigade and Parkesbourne Rural Fire Brigade attended, with Gunning Fish...
During a storm with heavy rain, workers at the CJ Hammer Pump & Machinery facility in Visalia, California, recorded a Southern California Edison transformer exploding after a lightning strike. The report says power was not affected and that no one was...
A fire broke out at an electrical substation on Canyonleigh Road near Brayton, New South Wales, producing a large cloud of black smoke. Rural Fire Service crews from the Southern Tablelands and Southern Highlands arrived at about 10am on Sunday 9 October...
At around 10 am on Friday 8 October 2021, an underground transformer exploded near Aspen and Hillsdale in Visalia, California, United States, and knocked out power in the surrounding area. Visalia fire officials investigated. No one was injured, and fire...
A fire broke out at outbuildings, including a garage, an unused cattery, two sheds and a summerhouse, on West End Road in Southampton shortly before 10:30 BST. The fire spread to the neighbouring electricity substation on West End Road, operated by Scottish...
A transformer fire at a substation near Imperial Highway and Associated Road in Brea, California, caused a power outage affecting approximately 15,000 people across Placentia, Fullerton and Brea, including the Brea Mall and the Brea Civic Center. Brea Fire...
A transformer explosion linked to a Thanksgiving Day outage on Ferguson Drive in Montebello shook homes and, residents said, sent a power surge through electrical lines. Families in eight households said they remained without power, with reports of damaged...
A brief news item from the utility's own news channel reported that crews from Southern California Edison (SCE) were continuing repair work at a substation that had been damaged. Only a headline and short feed summary are available. The source does not state...
A fire broke out on a Friday evening at Southern California Edison's substation near Jamboree and Michelson in Irvine, California, referred to in the utility's account as both the Irvine substation and the Cabrillo substation. The fire temporarily cut power...
On the morning of Saturday 17 November 2018, residents in parts of Signal Hill, Cal Heights and Bixby Knolls, California, lost power from about 7:45 a.m. The outage was caused by an isolated transformer fire in the Southern California Edison yard at the...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.