Fire damages Cabrillo substation in Irvine, cutting power to thousands

Aug 2019Published 17 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
supply cut for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Cabrillo substation near Jamboree and Michelson in Irvine, California
Operator
Southern California Edison
What
Fire at substation cut power to 28,000 customers
Response
SCE de-energised site quickly; fire department extinguished blaze soon after
Cause
Under investigation

Companies named in the reporting of this entry (being named is not a finding of fault): Southern California Edison

A fire broke out on a Friday evening at Southern California Edison's substation near Jamboree and Michelson in Irvine, California, referred to in the utility's account as both the Irvine substation and the Cabrillo substation. The fire temporarily cut power to about 28,000 customers in Irvine and part of Newport Beach. SCE equipment de-energised the site quickly and the local fire department extinguished the blaze soon after it started. All power was restored within two days using temporary fixes, after which crews worked around the clock to complete full repairs.

The substation is a complex site with four subtransmission lines of about 66,000 volts each, three power transformers rated between 12,000 and 66,000 volts, and 27 distribution circuits feeding field transformers. Fire damage was described by SCE as significant in portions of the substation. Environmental services teams cleaned soot and fire extinguisher residue and removed damaged equipment before damage assessment, construction, maintenance and test crews carried out repairs, with additional crews drawn from Palm Springs and the Hemet area.

The cause of the fire was still under investigation at the time of reporting, and no further contributing factors were disclosed.

  1. Quick de-energisation by SCE equipment limited fire spread at the 66 kV substation.
  2. Local fire crews can extinguish substation fires if de-energised early.
  3. Temporary fixes allow supply restoration in two days before full repairs.

More lessons on spacing, layout and fire spread, fire suppression and firefighting, outages, backup supply and restoration, from every incident on the register.

  • Cause of the fire
  • Cost of repairs and downtime

This entry is updated when these are reported. Get an alert for the next one like it.

Published 2026-09-17. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Grid infrastructure incidents in the United States, by year, free with a credit (PNG).

Grid infrastructure incidents in the United States: 415 entries, with a free alert for the next one.

Substation and transformer fires: the counts, the latest entries and a free alert for the next one.

Browse the full register or submit an incident.