Energy-Storage.News reports a California court filing in which the owner of the Diablo battery storage project, a 200 MW system in Pittsburg, California, alleges technical failures after it took control following completion in April 2022. The filing alleges...
Fluence
Named in a role in 4 records, between 2019 and 2024.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Fluence? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Fluence
On 4 September 2021, the Moss Landing Energy Storage Facility in California, operated by Vistra Energy, experienced an overheating issue affecting a limited number of battery modules in its Phase I 300 MW/1200 MWh system. Local fire crews responded to a...
In April 2019 the McMicken Battery Energy Storage System, a small battery energy storage system of approximately 2 MW and 2 MWh installed at a distribution substation near the APS McMicken substation in Surprise, Arizona, and in service since 2017, suffered a...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.