← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Peterborough

Wryde Croft

Operational26 MWApplication 07/01411/FULSubmitted 1 July 2006Granted on appeal 1 April 2010

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
07/01411/FUL
Planning authority
Peterborough
County or area
Cambridgeshire
Nation
England
Technology
Onshore wind
Capacity
26 MW
Status
Operational
Operator or applicant
Renewable Energy Systems (RES)
Location
Nutsgrove, South of Thorney.
Appeal reference
08/00048/REFPP
Turbines
13, 100 m to tip
First operating
2016
  • 1 July 2006 Planning application submitted
  • 22 October 2008 Planning permission refused
  • 1 April 2010 Planning permission granted
  • 1 April 2010 Appeal granted
  • 1 September 2014 Construction started
  • 20 February 2016 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-2021, Wind turbine catches fire near Thorney in Lincolnshire, 5.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20212022Wind turbine catches fire near Thorney in Lincolnshire5.5 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms17 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm30 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Wryde Croft is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Peterborough.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.