Planning pack for this site, £295Other options

Battery storage · United Kingdom

Nutsgrove Farm, Thorney - Battery Energy Storage

Operator Cambridge Power Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 16 July 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Nutsgrove Farm, Thorney - Battery Energy Storage is a 50 MW battery storage site 10 km north-east of Primrose Place, Cambridgeshire, United Kingdom. Its planning application (23/01746/FUL) went to Peterborough on 27 December 2023 and was granted on 28 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Nutsgrove Farm, Thorney - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 89 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells89 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction133 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire165 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cambridge Power Limited
Location
Nutsgrove Farm Scolding Drove Thorney Peterborough Peterborough, Cambridgeshire, PE6 0TP, United Kingdom
Planning authority
Peterborough
Planning application
23/01746/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01746/FUL, with what the planning evidence pack adds for this site.

Every application in Peterborough · Alerts for applications and incidents near here

  • 27 December 2023 Planning application submitted
  • 28 June 2024 Planning permission granted
  • 28 June 2029 Planning permission runs out

None found. The register holds no published incident that names Nutsgrove Farm, Thorney - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Nutsgrove Farm, Thorney - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Nutsgrove Farm, Thorney - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Nutsgrove Farm, Thorney - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 July 2024.
Where is Nutsgrove Farm, Thorney - Battery Energy Storage?
10 km north-east of Primrose Place, Cambridgeshire, United Kingdom (postcode PE6 0TP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).