← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Adur

Worthing College, Sanditon Way - Solar Panels

Awaiting Construction0.2 MWApplication NOTICE/0023/24Submitted 6 January 2025Granted 3 March 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
NOTICE/0023/24
Planning authority
Adur
County or area
Sussex
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Green Nation Solar Energy
Location
Worthing College 1 Sanditon Way, BN14 9FD
  • 6 January 2025 Planning application submitted
  • 3 March 2025 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1422, Firefighters tackle solar panel fire in Yapton, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14222025Firefighters tackle solar panel fire in Yapton16 kmMinor
EIR-20852020Fire involving solar panels at a house in Barnham, West Sussex19 kmMinor
EIR-15222026Fire damages roof with one solar panel in The Charltons19 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BN14 9FD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Adur.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.