← Back to West Sussex
Planning pack for this site, £295Other options

Solar · United Kingdom

Chartwell Road - Solar Panels

Operator Bidfood · Owner Bid Corporation Limited

Awaiting Construction0.4 MWData checked 18 November 2026Source record dated 29 July 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chartwell Road - Solar Panels is a 0.4 MW solar farm in Lancing, West Sussex, United Kingdom. Its planning application (NOTICE/0016/22) went to Adur on 14 July 2022 and was granted on 1 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BIDFOOD LIMITED (00549410), active, since 1955. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chartwell Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1522, Fire damages roof with one solar panel in The Charltons, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15222026Fire damages roof with one solar panel in The Charltons16 kmMinor
EIR-15272023Fire affects solar panels on nursing home roof in Woodingdean18 kmMinor
EIR-14222025Firefighters tackle solar panel fire in Yapton20 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Bidfood
Owner
Bid Corporation Limited
Location
32 Chartwell Road Lancing Business Park Lancing, West Sussex, BN15 8TU, United Kingdom
Planning authority
Adur
Planning application
NOTICE/0016/22

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for NOTICE/0016/22, with what the planning evidence pack adds for this site.

Every application in Adur · Alerts for applications and incidents near here

  • 14 July 2022 Planning application submitted
  • 1 September 2022 Planning permission granted

None found. The register holds no published incident that names Chartwell Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Chartwell Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chartwell Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chartwell Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2022.
Where is Chartwell Road - Solar Panels?
In Lancing, West Sussex, United Kingdom (postcode BN15 8TU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).