Solar · United Kingdom

Lancing College Campus

Operator Lancing College

Application Withdrawn1 MWData checked 16 November 2026Source record dated 11 March 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lancing College Campus is a 1 MW solar farm on the edge of Lancing, Hampshire, United Kingdom. Its planning application (SDNP/18/05306/FUL) went to Adur on 22 January 2019 and was withdrawn on 11 March 2019. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 21 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

182 energy sites within 40 km for Lancing College Campus

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Lancing College
Location
College Drive, Lancing, West Sussex, Hampshire, BN15 0RW, United Kingdom
Planning authority
Adur
Planning application
SDNP/18/05306/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SDNP/18/05306/FUL, with what the planning evidence pack adds for this site.

Every application in Adur · Alerts for applications and incidents near here

  • 22 January 2019 Planning application submitted
  • 11 March 2019 Application withdrawn

None found. The register holds no published incident that names Lancing College Campus. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lancing College Campus had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lancing College Campus; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lancing College Campus?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 11 March 2019.
Where is Lancing College Campus?
On the edge of Lancing, Hampshire, United Kingdom (postcode BN15 0RW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).