← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Greenwich

Twin Tumps Way - Solar Panels

Operational0.6 MWApplication 22/0655/PASubmitted 22 February 2022Granted 15 December 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/0655/PA
Planning authority
Greenwich
County or area
London
Nation
England
Technology
Solar
Capacity
0.6 MW
Status
Operational
Operator or applicant
WM Morrisons Supermarkets Plc
Location
Morrisons, 5 Twin Tumps Way, Thamesmead, SE28 8RD
First operating
2022
  • 22 February 2022 Planning application submitted
  • 12 May 2022 Construction started
  • 28 May 2022 Operational
  • 15 December 2022 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 9.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London9.2 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel18 kmSignificant
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected21 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SE28 8RD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Greenwich.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.