← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Warwick

Tollgate Farm

Operational4.3 MWApplication W/14/1266Submitted 20 August 2014Granted 12 January 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
W/14/1266
Planning authority
Warwick
County or area
Warwickshire
Nation
England
Technology
Solar
Capacity
4.3 MW
Status
Operational
Operator or applicant
CRE8 Energy (UK)
Location
Tollgate Farm, Banbury Road, Bishops Tachbrook, Leamington Spa, CV33 9QJ
First operating
2016
  • 20 August 2014 Planning application submitted
  • 12 January 2015 Planning permission granted
  • 16 January 2016 Construction started
  • 16 March 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college34 kmMinor
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property50 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge56 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CV33 9QJ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Warwick.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.