Solar · United Kingdom
Brickyard Barn
Operator Sun Glow Power
Operational4.1 MWData checked 16 November 2026Source record dated 27 November 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Brickyard Barn is a 4.1 MW solar farm 4.1 km south-east of Warwick, United Kingdom. Its planning application (W/13/1608) went to Warwick on 15 November 2013 and was granted on 20 December 2013. It has been operating since 27 November 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Brickyard Barn changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 4.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Sun Glow Power
- Location
- Land at Brickyard Barn, Mallory Road, Bishops Tachbrook, Leamington Spa, Warwickshire, CV33 9QD, United Kingdom
- Planning authority
- Warwick
- Planning application
- W/13/1608
- First operating
- 2014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for W/13/1608, with what the planning evidence pack adds for this site.
Every application in Warwick · Alerts for applications and incidents near here
Timeline
- 15 November 2013 Planning application submitted
- 20 December 2013 Planning permission granted
- 1 October 2014 Construction started
- 27 November 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Brickyard Barn. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Brickyard Barn had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Brickyard Barn; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Brickyard Barn?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 November 2014.
- Where is Brickyard Barn?
- 4.1 km south-east of Warwick, United Kingdom (postcode CV33 9QD).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).