← Back to Warwickshire

Solar · United Kingdom

Tollgate Farm

Operator CRE8 Energy (UK)

Operational4.3 MWData checked 16 November 2026Source record dated 31 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tollgate Farm is a 4.3 MW solar farm 5.2 km north-east of Wellesbourne, Warwickshire, United Kingdom. Its planning application (W/14/1266) went to Warwick on 20 August 2014 and was granted on 12 January 2015. It has been operating since 16 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 50 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

499 energy sites within 40 km for Tollgate Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
CRE8 Energy (UK)
Location
Tollgate Farm, Banbury Road, Bishops Tachbrook, Leamington Spa, Warwickshire, CV33 9QJ, United Kingdom
Planning authority
Warwick
Planning application
W/14/1266
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/14/1266, with what the planning evidence pack adds for this site.

Every application in Warwick · Alerts for applications and incidents near here

  • 20 August 2014 Planning application submitted
  • 12 January 2015 Planning permission granted
  • 16 January 2016 Construction started
  • 16 March 2016 Operational

None found. The register holds no published incident that names Tollgate Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tollgate Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tollgate Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tollgate Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 August 2016.
Where is Tollgate Farm?
5.2 km north-east of Wellesbourne, Warwickshire, United Kingdom (postcode CV33 9QJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).