Sunnica Energy Farm (East and West)

Awaiting Construction500 MWApplication EN010106Submitted 18 November 2021Granted 12 July 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
EN010106
Planning authority
The Planning Inspectorate - National Infrastructure
County or area
Cambridgeshire
Nation
England
Technology
Solar
Capacity
500 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Sunnica
Location
Land 4.5km East of Burwell and Land 2.5km South-West of Mildenhall
  • 18 November 2021 Planning application submitted
  • 12 July 2024 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium27 kmMinor
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof56 kmSignificant
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire63 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Sunnica Energy Farm (East and West) is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in The Planning Inspectorate - National Infrastructure.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.