Mildenhall Hub, Sheldrick Way - Solar Panel
Operator West Suffolk Council
Under ConstructionData checked 16 November 2026Source record dated 24 July 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Mildenhall Hub, Sheldrick Way - Solar Panel is a solar farm in Mildenhall, Suffolk, United Kingdom. Its planning application (DC/25/1798/FUL) went to West Suffolk on 24 November 2025 and was granted on 5 March 2026. Construction started on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 17 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Mildenhall Hub, Sheldrick Way - Solar Panel changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mildenhall Hub, Sheldrick Way - Solar Panel sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 30 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1262 | 2024 | Fire reported on solar-panel roof at Fitzwilliam College auditorium | 30 km | Minor |
| EIR-2815 | 2026 | Solar panel on school roof starts primary school fire in Ipswich | 55 km | Significant |
| EIR-2731 | 2021 | Electrical fault in solar panel control unit sparks loft fire in Ipswich | 55 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Under Construction
- Operator or applicant
- West Suffolk Council
- Location
- Mildenhall Hub, Sheldrick Way, Bury St Edmunds, Suffolk, IP28 7JX, United Kingdom
- Planning authority
- West Suffolk
- Planning application
- DC/25/1798/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/25/1798/FUL, with what the planning evidence pack adds for this site.
Every application in West Suffolk · Alerts for applications and incidents near here
Status changed from Awaiting Construction to Under Construction on 16 November 2026.
Timeline
- 24 November 2025 Planning application submitted
- 5 March 2026 Planning permission granted
- 1 June 2026 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Mildenhall Hub, Sheldrick Way - Solar Panel. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Mildenhall Hub, Sheldrick Way - Solar Panel had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Mildenhall Hub, Sheldrick Way - Solar Panel; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Mildenhall Hub, Sheldrick Way - Solar Panel?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Mildenhall Hub, Sheldrick Way - Solar Panel?
- In Mildenhall, Suffolk, United Kingdom (postcode IP28 7JX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).