← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · West Lindsey

Stainton Oil Production Facility

Application Withdrawn28 MWApplication M03/p/1293Submitted 19 January 2004Withdrawn 4 February 2009

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
M03/p/1293
Planning authority
West Lindsey
County or area
Lincolnshire
Nation
England
Technology
Onshore wind
Capacity
28 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Star Energy
Location
Stainton Oil Production Facility , Ashing Lane , Dunholme
Turbines
14
  • 19 January 2004 Planning application submitted
  • 4 February 2009 Application withdrawn

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0923, Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure, 37 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-09232009Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure37 kmSignificant
EIR-19462022Wind turbine fire sends black smoke across Hull52 kmSignificant
EIR-18102022Wind turbine at Cargill Hull factory damaged by fire52 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Stainton Oil Production Facility is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in West Lindsey.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.