Register / Wind (onshore) / EIR-0923

← Back to the list

Wind (onshore)United Kingdom2009

Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure

EIR-0923

A 65 ft blade detached from a wind turbine at the Conisholme wind farm, operated by Ecotricity, in Lincolnshire after bolts attaching it to the hub failed. The incident initially attracted public attention because local residents reported seeing glowing orange-yellow spheres in the sky on the night it occurred, prompting speculation about a collision with an unidentified flying object. Following weeks of analysis, the turbine manufacturer Enercon released an interim report identifying material fatigue as the cause, with the bolt failure described as an effect rather than the root cause. Further tests were being carried out to determine what caused the bolts to come loose, focusing on the blade and hub components. The damaged turbine was repaired within days at the manufacturer's expense. Injuries are not reported in the source.

Material fatigue in the blade or hub components is understood to have placed the attaching bolts under excessive stress, leading to their failure and the blade detaching. Bolt fatigue and design problems were reported to have been ruled out. The full manufacturer's report had not been published at the time of reporting.

  1. Bolt failures at rotor hub connections should be treated as a symptom requiring investigation of the underlying blade and hub components, not just the fasteners themselves.
  2. Material fatigue in highly loaded rotating components can develop over time and may not be evident until a sudden failure, which supports structured inspection regimes.
  3. Sudden dramatic failures attract public speculation, so operators benefit from prompt, factual communication while investigation continues.

Published 2026-09-16. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Related incidents

Browse the full register or submit an incident.