Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure
2009Published 16 Sept 2026Responsible editor: Chief Editor
- Where
- Conisholme wind farm in Lincolnshire
- Operator
- Ecotricity
- What
- A 65 ft blade detached after bolts attaching it to the hub failed
- Injuries
- None reported
- Cause
- Material fatigue in the blade or hub components
Get the next one by email
Free alerts on wind (onshore) incidents in the United Kingdom, and an email when EIR-0923 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Ecotricity, Enercon
What happened
A 65 ft blade detached from a wind turbine at the Conisholme wind farm, operated by Ecotricity, in Lincolnshire after bolts attaching it to the hub failed. The incident initially attracted public attention because local residents reported seeing glowing orange-yellow spheres in the sky on the night it occurred, prompting speculation about a collision with an unidentified flying object. Following weeks of analysis, the turbine manufacturer Enercon released an interim report identifying material fatigue as the cause, with the bolt failure described as an effect rather than the root cause.
Further tests were being carried out to determine what caused the bolts to come loose, focusing on the blade and hub components. The damaged turbine was repaired within days at the manufacturer's expense. Injuries are not reported in the source.
Contributing factors
Material fatigue in the blade or hub components is understood to have placed the attaching bolts under excessive stress, leading to their failure and the blade detaching. Bolt fatigue and design problems were reported to have been ruled out. The full manufacturer's report had not been published at the time of reporting.
Lessons learned
- Check blade and hub components when bolts at the rotor hub fail, as fatigue there can stress fasteners.
- Inspect highly loaded rotating parts on a schedule, since fatigue can lead to sudden detachment.
More lessons on structural integrity and turbines, from every incident on the register.
Not yet known
- What caused the bolts to come loose
- Full manufacturer's report findings
- Turbine model and age
This entry is updated when these are reported. Get an alert for the next one like it.
Other entries that name Lincolnshire
Published 2026-09-16. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.