Onshore wind · United Kingdom
Welton Gathering Centre
Operator Star Energy
Application Withdrawn2 MWData checked 16 November 2026Source record dated 29 June 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Welton Gathering Centre is a 2 MW wind farm 4.7 km south-east of Dunholme, Lincolnshire, United Kingdom. Its planning application (M03/p/1291) went to West Lindsey on 8 December 2003 and was withdrawn on 29 June 2011. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 21 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Welton Gathering Centre changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Star Energy
- Location
- Welton Gathering CentreBarfields LaneSudbroke, Lincolnshire, United Kingdom
- Planning authority
- West Lindsey
- Planning application
- M03/p/1291
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for M03/p/1291, with what the planning evidence pack adds for this site.
Every application in West Lindsey · Alerts for applications and incidents near here
Timeline
- 8 December 2003 Planning application submitted
- 29 June 2011 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Welton Gathering Centre. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Welton Gathering Centre had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Welton Gathering Centre; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Welton Gathering Centre?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 29 June 2011.
- Where is Welton Gathering Centre?
- 4.7 km south-east of Dunholme, Lincolnshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).