← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Battery storage · Wokingham

Spencers Wood Solar Farm, Basingstoke Road - Solar Array

Awaiting ConstructionApplication 232653Submitted 23 November 2023Granted 26 March 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
232653
Planning authority
Wokingham
County or area
Berkshire
Nation
England
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Greentech
Location
Spencers Wood Solar Farm Land north of Sheepbridge Court Farm Basingstoke Road Swallowfield, RG7 1PT
  • 23 November 2023 Planning application submitted
  • 26 March 2025 Planning permission granted
  • 26 March 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 76 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire76 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction96 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter189 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near RG7 1PT is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Wokingham.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.