Planning application · Solar · Test Valley

Shipton Bellinger - Park House Corner Solar Farm

Operational5.4 MWApplication 11/00554/FULLNSubmitted 4 March 2011Granted 17 May 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
11/00554/FULLN
Planning authority
Test Valley
County or area
Hampshire
Nation
England
Technology
Solar
Capacity
5.4 MW
Status
Operational
Operator or applicant
Low Carbon Solar
Location
Salisbury Road, Shipton Bellinger, Hampshire
First operating
2013
  • 4 March 2011 Planning application submitted
  • 17 May 2011 Planning permission granted
  • 3 December 2012 Construction started
  • 21 February 2013 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1534, Storm Eunice loosens solar panels on Eastleigh flats, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats33 kmMinor
EIR-19642022Fire damages solar panels at Verwood farm during heatwave38 kmSignificant
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing44 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Shipton Bellinger - Park House Corner Solar Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Test Valley.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.