Parkhouse Corner (Orta Solar) is a 6.6 MW solar farm 4.1 km south of Tidworth, Hampshire, United Kingdom. Its planning application (12/01725/FULLN) went to Test Valley on 9 August 2012 and was granted on 14 November 2012. It has been operating since 23 February 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 272 energy sites within 40 km for Parkhouse Corner (Orta Solar)

Members see the sites and incidents around this one, and every record behind them.

ORTA SOLAR LTD (07624793), active, since 2011. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Orta Solar
Location
Snoddington Farm, Salisbury Road, Shipton Bellinger, Tidworth, Hampshire, SP9, United Kingdom
Planning authority
Test Valley
Planning application
12/01725/FULLN
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/01725/FULLN, with what the planning evidence pack adds for this site.

Every application in Test Valley · Alerts for applications and incidents near here

  • 9 August 2012 Planning application submitted
  • 14 November 2012 Planning permission granted
  • 3 December 2012 Construction started
  • 23 February 2013 Operational

None found. The register holds no published incident that names Parkhouse Corner (Orta Solar). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Parkhouse Corner (Orta Solar) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Parkhouse Corner (Orta Solar); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Parkhouse Corner (Orta Solar)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 April 2013.
Where is Parkhouse Corner (Orta Solar)?
4.1 km south of Tidworth, Hampshire, United Kingdom (postcode SP9).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).