← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Huntingdonshire

Ramsey Wind Farm Extension

Operational8 MWApplication 1101865FULSubmitted 8 November 2011Granted 22 May 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
1101865FUL
Planning authority
Huntingdonshire
County or area
Cambridgeshire
Nation
England
Technology
Onshore wind
Capacity
8 MW
Status
Operational
Operator or applicant
REG Windpower
Location
St Marys Road, Ramsey
Turbines
4
First operating
2015
  • 8 November 2011 Planning application submitted
  • 22 May 2013 Planning permission granted
  • 1 November 2014 Construction started
  • 23 April 2015 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1275, Fire damages Siemens Gamesa turbine at French Farm wind farm, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm12 kmSignificant
EIR-15782024Wind turbine fire near Chumleigh in Devon12 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms13 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Ramsey Wind Farm Extension is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Huntingdonshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.