← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · York

Poppleton Solar Farm

Awaiting Construction32.6 MWApplication 23/02254/FULMSubmitted 6 December 2023Granted 8 October 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/02254/FULM
Planning authority
York
County or area
North Yorkshire
Nation
England
Technology
Solar
Capacity
32.6 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ampyr Solar Europe UK Holdings Limited
Location
South Of New Farm Lords Lane Nether Poppleton, YO26 6GQ
  • 6 December 2023 Planning application submitted
  • 8 October 2024 Planning permission granted
  • 8 October 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton30 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster59 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre74 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near YO26 6GQ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in York.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.