← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Barnsley

Park Spring Wind Farm

Operational8.6 MWApplication 2013/0860Submitted 7 October 2013Granted 9 April 2014

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2013/0860
Planning authority
Barnsley
County or area
South Yorkshire
Nation
England
Technology
Onshore wind
Capacity
8.6 MW
Status
Operational
Operator or applicant
EDF Energy Renewables
Location
Ferry Moor Lane, Cudworth, Barnsley
Turbines
3
First operating
2015
  • 7 October 2013 Planning application submitted
  • 9 April 2014 Planning permission granted
  • 15 April 2015 Construction started
  • 20 November 2015 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0863, Fire destroys single turbine at Knabs Ridge wind farm near Harrogate, 47 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate47 kmSignificant
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm56 kmMinor
EIR-19462022Wind turbine fire sends black smoke across Hull74 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Park Spring Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Barnsley.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.