Planning application · Solar · Tonbridge and Malling

Offham Landfill Site - Solar PV Array

Under Construction10.2 MWApplication KCC/TM/0090/2021Submitted 20 April 2021Granted 13 October 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
KCC/TM/0090/2021
Planning authority
Tonbridge and Malling
County or area
Kent
Nation
England
Technology
Solar
Capacity
10.2 MW
Status
Under Construction
Operator or applicant
Infinis Limited
Location
Offham Landfill Site, Teston Road, Offham, West Malling, ME19 5PF
  • 20 April 2021 Planning application submitted
  • 13 October 2023 Planning permission granted
  • 1 March 2024 Construction started
  • 13 October 2026 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London32 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel34 kmSignificant
EIR-15302023Electrical fault causes solar panel fire in Wickford house37 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near ME19 5PF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Tonbridge and Malling.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.