← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Westmorland and Furness

North James Cropper, Garnett Bridge Road - Solar Array

Awaiting Construction3 MWApplication SL/2022/1159Submitted 3 January 2023Granted 17 January 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
SL/2022/1159
Planning authority
Westmorland and Furness
County or area
Cumbria
Nation
England
Technology
Solar
Capacity
3 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ellergreen Hydro
Location
Fields to the North James Cropper PLC & west of Garnett Bridge Road Burneside, LA9 6PZ
  • 3 January 2023 Planning application submitted
  • 17 January 2024 Planning permission granted
  • 17 January 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 83 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre83 kmMinor
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school97 kmSignificant
EIR-14992025Solar panels linked to fires at council buildings in Northumberland111 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near LA9 6PZ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Westmorland and Furness.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.