← Back to Cumbria

Solar · United Kingdom

James Cropper Effluent Plant

Operator Ellergreen Estate

Application Withdrawn1 MWData checked 16 November 2026Source record dated 30 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

James Cropper Effluent Plant is a 1 MW solar farm 3.4 km north of Kendal, Cumbria, United Kingdom. Its planning application (SL/2019/1027) went to Westmorland and Furness on 17 December 2019 and was withdrawn on 21 January 2020. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 14 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

117 energy sites within 40 km for James Cropper Effluent Plant

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Ellergreen Estate
Location
James Cropper Effluent Plant, Burneside, Kendal, Cumbria, Cumbria, LA9 6PZ, United Kingdom
Planning authority
Westmorland and Furness
Planning application
SL/2019/1027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SL/2019/1027, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 17 December 2019 Planning application submitted
  • 21 January 2020 Application withdrawn

None found. The register holds no published incident that names James Cropper Effluent Plant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has James Cropper Effluent Plant had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names James Cropper Effluent Plant; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of James Cropper Effluent Plant?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2020.
Where is James Cropper Effluent Plant?
3.4 km north of Kendal, Cumbria, United Kingdom (postcode LA9 6PZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).