Solar · United Kingdom
Murley Moss - Additional Solar Design And Build
Operator Lake District National Park
Under ConstructionData checked 16 November 2026Source record dated 31 March 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Murley Moss - Additional Solar Design And Build is a solar farm on the edge of Kendal, Cumbria, United Kingdom. Its planning application went to Westmorland and Furness. Construction started on 26 January 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 17 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Murley Moss - Additional Solar Design And Build changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Murley Moss - Additional Solar Design And Build sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 83 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1502 | 2025 | Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre | 83 km | Minor |
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 89 km | Minor |
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 92 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Under Construction
- Operator or applicant
- Lake District National Park
- Location
- Wayfaring House, Murley Moss Business Park, Oxenholme Road, Kendal, Cumbria, LA9 7RL, United Kingdom
- Planning authority
- Westmorland and Furness
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Westmorland and Furness · Alerts for applications and incidents near here
Timeline
- 26 January 2026 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Murley Moss - Additional Solar Design And Build. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Murley Moss - Additional Solar Design And Build had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Murley Moss - Additional Solar Design And Build; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Murley Moss - Additional Solar Design And Build?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2026.
- Where is Murley Moss - Additional Solar Design And Build?
- On the edge of Kendal, Cumbria, United Kingdom (postcode LA9 7RL).