Burneside Mill, Burneside

Operator Burenside Community Energy Limited

Operational1 MWData checked 16 November 2026Source record dated 11 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Burneside Mill, Burneside is a 1 MW solar farm 3.4 km north of Kendal, Cumbria, United Kingdom. Its planning application (SL/2021/0107) went to Westmorland and Furness on 3 February 2021 and was granted on 30 April 2021. It has been operating since 15 June 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 117 energy sites within 40 km for Burneside Mill, Burneside

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Burenside Community Energy Limited
Location
Burneside Mill, Burneside, Cumbria, LA9 6PZ, United Kingdom
Planning authority
Westmorland and Furness
Planning application
SL/2021/0107
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SL/2021/0107, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 3 February 2021 Planning application submitted
  • 30 April 2021 Planning permission granted
  • 24 May 2021 Construction started
  • 15 June 2021 Operational

None found. The register holds no published incident that names Burneside Mill, Burneside. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Burneside Mill, Burneside had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Burneside Mill, Burneside; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Burneside Mill, Burneside?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
Where is Burneside Mill, Burneside?
3.4 km north of Kendal, Cumbria, United Kingdom (postcode LA9 6PZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).