← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · North West Leicestershire

Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels

Awaiting Construction0.6 MWApplication 23/01643/FULMSubmitted 8 December 2023Granted 4 July 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/01643/FULM
Planning authority
North West Leicestershire
County or area
Leicestershire
Nation
England
Technology
Solar
Capacity
0.6 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Livesey Brothers
Location
Mushroom Farm, Lower Fields Normanton Road, Packington, Ashby de la Zouch, LE65 1XA
  • 4 July 2010 Planning permission expired
  • 8 December 2023 Planning application submitted
  • 4 July 2024 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge28 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college38 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby41 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near LE65 1XA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North West Leicestershire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.