Planning pack for this site, £295Other options

Solar · United Kingdom

Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels

Operator Livesey Brothers

Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 16 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels is a 0.6 MW solar farm 3.2 km south-east of Ashby-de-la-Zouch, Leicestershire, United Kingdom. Its planning application (23/01643/FULM) went to North West Leicestershire on 8 December 2023 and was granted on 4 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 42 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2151, Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge28 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college38 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby41 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Livesey Brothers
Location
Mushroom Farm, Lower Fields Normanton Road, Packington, Ashby de la Zouch, Leicestershire, LE65 1XA, United Kingdom
Planning authority
North West Leicestershire
Planning application
23/01643/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01643/FULM, with what the planning evidence pack adds for this site.

Every application in North West Leicestershire · Alerts for applications and incidents near here

  • 4 July 2010 Planning permission expired
  • 8 December 2023 Planning application submitted
  • 4 July 2024 Planning permission granted

None found. The register holds no published incident that names Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 July 2024.
Where is Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels?
3.2 km south-east of Ashby-de-la-Zouch, Leicestershire, United Kingdom (postcode LE65 1XA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).