Solar · United Kingdom

Packington Solar Farm

Operator Solstice Renewables

Operational13.9 MWData checked 16 November 2026Source record dated 14 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Packington Solar Farm is a 13.9 MW solar farm on the edge of Measham, Leicestershire, United Kingdom. Its planning application (14/00535/FULM) went to North West Leicestershire on 27 June 2014 and was granted on 20 October 2014. It has been operating since 16 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 44 other energy sites within 10 km, 36 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 14 other sites and 714 energy sites within 40 km for Packington Solar Farm

Members see the sites and incidents around this one, and every record behind them.

SOLSTICE RENEWABLES LIMITED (08415066), dissolved, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
13.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Solstice Renewables
Location
Land South Of Babelake Street Packington Ashby De La Zouch Leicestershire LE65 1TG, Leicestershire, United Kingdom
Planning authority
North West Leicestershire
Planning application
14/00535/FULM
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00535/FULM, with what the planning evidence pack adds for this site.

Every application in North West Leicestershire · Alerts for applications and incidents near here

  • 27 June 2014 Planning application submitted
  • 20 October 2014 Planning permission granted
  • 15 November 2014 Construction started
  • 16 March 2015 Operational

None found. The register holds no published incident that names Packington Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Packington Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Packington Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Packington Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 May 2015.
Where is Packington Solar Farm?
On the edge of Measham, Leicestershire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).